Projects

  HVAC Equipment Replacement
Provided design, construction management of chiller, cooling tower, pump and controls upgrades and replacement while maintaining manufacturing and facility operations.Site Master Planning
Provided 5 year Site Master Planning for the procurement, reorganization and expansion of existing facilities to meet projected production and site demands. Engineering Departmental Practices and Policy
Authored and developed CAD standards, Good Engineering Practices policy, standard operating procedures for Commissioning, Project Execution / Master Plans, project numbering and filing systems and project accounting systems.Small Volume Parenteral Manufacturing Facility - New Lyo and Lyo Loading Room
Provided design, project management and construction management for new 300 sf class 100 lyo load/unload room and 1,000 sf interstitial /equipment level expansion. Installation was completed adjacent to existing operations without a loss of manufacturing during construction or during the integration of the autoloader to the new lyophilizer.Client Confidentiality is Protected. Please call our office for more information or a timeline of events.
   

 