SMITH / architects
about services projects cGMP contact
 
 
1  2  3  4  5  6  7  8  9 10

Projects

 

Syringe Fill Line
Provided project management, design, construction management and commissioning and validation coordination of a new sterile syringe fill line. The project consisted of the construction of approximately 2,500 sf of ISO 5 through ISO 8 rooms to support, filling, syringe denesting, plunger rod insertion, semi-automatic inspection, pouching and VHP sterilization equipment surrounded by current manufacturing operations. The project included equipment selection, FAT, SAT, commissioning and validation of equipment. Corporate Seismic Study and Risk Management
Assisted in corporate review of seismic susceptibility and insurance requirements for multiple facilities, Resulted in recommendations for risk reduction through geographic dispersion of warehousing and manufacturing. Solid Dose Packaging Facility
Provided facility design, construction phase planning, laboratory design, equipment layout and project management support of a new solid dose packaging line in international facility. The project consisted of approximately 5,000 sf of packaging/ manufacturing area and 2,000 sf of laboratory expansion area within an existing building shell.Client Confidentiality is Protected. Please call our office for more information or a timeline of events.


 
  All Content © Smith Architects 2012 - All Rights Reserved.