SMITH / architects
about services projects cGMP contact
 
 
1  2  3  4  5  6  7  8   9 10

Projects

  Pharmaceutical Facilities
Provided engineering design, equipment specification writing, vendor selection, factory approval testing and commissioning and validation services for a mono-vial sterile fluid filler, component washer and process heat / cool system. Provided production volume analysis of existing process equipment and full service design and engineering for new sterile fill line 247. Conducted personnel and material flow studies for component prep areas. Redesigned the HVAC system servicing the component prep areas to improve air exchange and minimize particulates.Validation of Facilities
Provided validation services for new and existing solid dose and aerosol manufacturing equipment, packaging systems, labeling systems and supporting quality control laboratories. Services included the writing of Protocols and SOP’s, IQ, OQ, PQ execution for utility systems, liquid nitrogen system, laboratory incubators and stability chambers. Sterile Water Processing Facility
Conceptual design, entitlement processing, architecture, engineering and construction support services for a 25,000 sf cGMP packaging and distribution facility. Tilt-up concrete construction with rooftop parking using pre-cast concrete column and deck system.Client Confidentiality is Protected. Please call our office for more information or a timeline of events.
   

 
  All Content © Smith Architects 2012 - All Rights Reserved.